Skip to content
Southern Utah
Kitchen & Bath
Home

Tub to shower conversions and walk-in showers

Tub to shower conversions and walk-in showers in St. George and Washington County by Southern Utah Kitchen & Bath. Properly waterproofed, tiled and finished with frameless glass by a licensed Utah contractor (license #9079324-5501), including curbless showers for staying in your home.

Bathroom with freestanding bath and walk-in shower; Desert Concepts, Southern Utah residential design
Desert Concepts · Bathroom with freestanding bath and walk-in shower

At a glance.

What
Shower and tub conversions
Where
Washington County, Utah
Cost / timeline
We focus on mid to high end remodels. Itemized budget and milestone schedule after a site visit.
Who does the work
Micah and JD Thompson, Utah contractor #9079324-5501, with long-standing subcontractors who share our standards

Start with how
the space works.

Built in, not covered over.

Liner and insert systems go in fast but hide whatever is behind them. We remove the old tub down to the framing, check for water damage, set a properly sloped shower pan, waterproof every surface and finish with tile and frameless glass.

Showers for staying in your home.

For clients planning to stay long term, we build low-threshold or curbless entries, wider openings, built-in benches, blocking for grab bars and handheld shower heads. Done well, an accessible shower looks like a design choice, not a medical one.

What the work includes

  • Tub removal and framing repair
  • Sloped shower pans and waterproofing
  • Curbless and low-threshold entries
  • Built-in benches and niches
  • Grab bar blocking
  • Frameless glass
  • Tile and stone surrounds
  • New valves and fixtures

A scope for
what comes next.

Three levels of change. We work on mid to high end homes, and every project gets a detailed budget with no hidden costs before work begins.

Cost guide · Updated 2026-10-20.
Every project gets an itemized budget with no hidden costs after a site visit.

Refresh

The tub removed and a tiled shower built in the same footprint, with new valve and glass.

Budget
Itemized after a site visit
Schedule
Written, reviewed at each milestone

Reconfigure

A larger shower: walls moved, plumbing relocated, a bench and niches built in.

Budget
Itemized after a site visit
Schedule
Written, reviewed at each milestone

Transform

A curbless primary shower with heated floor, linear drain and full-height tile as part of a bath remodel.

Budget
Itemized after a site visit
Schedule
Written, reviewed at each milestone

A clear path.
Considered at
every step.

From the first conversation to the final detail.

Material and color samples for a coordinated interior; Southern Utah residential remodeling
The choices that bring a home together.
  1. Listen

    Tell us how you live and what needs to change.

  2. Plan

    Define the layout, scope and selections.

  3. Agree

    Review the written estimate and project schedule.

  4. Build

    Coordinate the work and keep decisions documented.

  5. Walk through

    Review the finished space and remaining details together.

The details
make the difference.

Good work starts well before the first cut. It carries through to the last detail.

Wood cabinetry meeting stainless steel and white counters; Southern Utah residential remodeling
Wood. Stone. A place for everything.

In writing, on every project.

A written scope

Inclusions and exclusions documented before work begins.

A shared schedule

Milestones and changes discussed with you.

A considered finish

A final walkthrough with a written closeout list.

Recent work.

From a homeowner.

“Working with them was also a great experience and surprisingly very low stress.” Anne and Dan Adams, home remodel.

Shower and tub conversions questions.

Is a tiled shower better than an insert?

A tiled shower built over a proper waterproofing system lasts longer, can be any size and adds more value to the home. Inserts are faster but limited in size and style.

Can you make a shower accessible without it looking clinical?

Yes. Curbless entries, benches and hidden grab bar blocking can be built into a shower that looks like any high-end bath.

How long does a tub to shower conversion take?

Demolition, waterproofing, tile and glass each take their own time, and custom glass is fabricated after the tile is finished. You get a written schedule before we start.

Where we work.

Related services.

Open kitchen window connecting the home to a covered outdoor gathering area; Southern Utah residential remodeling
Your next chapter, at home.

Let’s make
room for
better.

Tell us what you have in mind.
We’ll take it from there.

Start your project

Or call 435-619-4315